Widening / Improvement to 4-lane with paved shoulder from Ch. 88.000 km to
Ch 99.930 km (design Ch. 84.100 km to Ch. 96.000 km) of the Sagunbashi
Forest (near Nichinta) Bypass to the startimg of Krishnai Bypass Section
(Package 7) of Bilasipura-Guwahati Road (NH-17) in the state of Assam on EPC
mode.
Mizoram
Widening and improvement of road from Durtlang Leitan to Sihphir Section
(length 10.25 km) of Aizawl-Durtlang-Lungdai-Kawnpui road in the state of
Mizoram under CRIF SCHEMR.
Construction of Bamboo Link Road from Lengpui to Saiphal Bamboo Plantation
(41 km) under PM-DevINE.
Construction of Bamboo Link Road from Tuirial Airfield to North Chaltlang
(18 km) under PM Development.
Content is for personal, non-commercial use only.
Nagaland
Construction of 2-laning with hard shoulder of Peren-Dimapur section NH-129A
from design km 146+208 to km 163.592 (length 17.384 km) in the state of
Nagaland on EPC mode (Pkg-III) under NH(O)-TSP.
Construction of 2-laning with hard shoulder of Peren-Dimapur section NH-129A
from km 126.775 to design km 146+208 (length 19.433 km) in the state of
Nagaland on EPC mode (Pkg-II) under NH(O)-TSP.
Upgradation of road from Mhainnamtsi to Heningkunglwa via Dungki and Lamhai
in Peren District” (length = 12.50 km), scheme of Central Road and
Infrastructure Fund (CRIF) during the year 2023-24 (Job No.
CRIF/NG/2023-24/39).
Construction of road from Jaluki (NH-129A) to New DC Complex Model Township,
Peren, in the state of Nagaland under NESID for the year 2023-24 (total
length = 9.959 km).
Construction of 2-laning with paved / hard shoulder of Peren-Dimapur Road
section on NH-129A from design km 120.500 to design km 123.380 (Construction
Ch. 120.320 to Ch. 123.200) (Design length = 2.88 km) in the state of
Nagaland on EPC mode under NH(O)-TSP (Package-1A)
Construction of road from Thizama via Kohima Bypass Road to proposed Chichu
Airport via Nerhi Model village.
Sikkim
Construction / Upgradation of existing road to 2-lane with paved shoulder
including geometric improvement from Ranipool to Pakyong from km 2.00 to
16.167 (balance work) of NH-717A on EPC basis under SARDP-NE Phase “A”.
Tripura
Improvement and widening to two lanes with paved shoulder of road from
existing km 438.170 (Khowai Chowmuhani) to existing km 439.410 (South
Pulinpur) of NH-8 and from design km 0.000 (South Pulinpur) to design km
36.000 (Near Rangamati) of NH-208 on Khowai-Teliamura-Harina Section (total
length 37.24 km) (Package-II) in the state of Tripura on EPC mode under JICA
ODA Loan Phase-6.