Project Management Consultancy

Assam

  • Four laning of NH-37 from Teliagaon to Rangagara (km 288.600 to 291.000) in the state of Assam under SARDP-NE Phase A on EPC mode Package-2.
  • Four laning of NH-37A from Kaliabor Tiniali road junction to Dolabari junction (km 0.000 to 17.300) including construction of new Brahmaputra Bridge on EPC basis in the state of Assam under SARDP-NE.
  • Contract administration of Contract Pkg-I, II and IV of construction of balance work of the 4-laning of the section from Jorhat to Jhanji of NH-37 (Old) in the state of Assam under SARDP-NE, under EPC mode.

Nagaland

  • Special repair of NH-202, Mokokchung-Tuensang (from km 00.000 to 95.000) (total length = 95.000 km) in the state of Nagaland for the FY 2020-21.
  • Construction of 2-laning with hard shoulder of Peren-Dimapur section NH-129A from design km 146+208 to km 163.592 (length 17.384 km) in the state of Nagaland on EPC mode (Pkg-III) under NH(O)-TSP.
  • Balance work for construction of 2-laning with hard shoulder of Peren-Dimapur section NH-129A from km 126.775 to design km 146+208 (length 19.433 km) in the state of Nagaland on EPC mode (Pkg-II) under NH(O)-TSP.
  • Upgradation of road from Mhainnamtsi to Heningkunglwa via Dungki and Lamhai in Peren District under Central Road and Infrastructure Fund (CRIF) scheme for the state of Nagaland during the year 2023-24 (total length = 12.505 km).
  • Construction of road from Jaluki (NH-129A) to New DC Complex Model Township, Peren, in the state of Nagaland under NESID for the year 2023-24 (total length = 9.959 km).
  • Construction of 2-laning with paved / hard shoulder of Peren-Dimapur Road section on NH-129A from design km 120.500 to design km 123.380 (Construction Ch. 120.320 to Ch. 123.200) (Design length = 2.88 km) in the state of Nagaland on EPC mode under NH(O)-TSP (Package-1A).

Sikkim

  • Construction / Upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Ranipool to Pakyong from km 2.00 to 16.167 (balance work) of NH-717A on EPC basis under SARDP-NE Phase “A”.

Tripura

  • Improvement and widening to two lanes with paved shoulder of road from existing km 438.170 (Khowai Chowmuhani) to existing km 439.410 (South Pulinpur) of NH-8 and from design km 0.000 (South Pulinpur) to design km 36.000 (Near Rangamati) of NH 208 on Khowai-Teliamura-Harina section (total length 37.24 km) (Package-II) in the state of Tripura on EPC mode under JICA ODA Loan Phase-6.