Four laning of NH-37 from Teliagaon to Rangagara (km 288.600 to 291.000) in
the state of Assam under SARDP-NE Phase A on EPC mode Package-2.
Four laning of NH-37A from Kaliabor Tiniali road junction to Dolabari
junction (km 0.000 to 17.300) including construction of new Brahmaputra
Bridge on EPC basis in the state of Assam under SARDP-NE.
Contract administration of Contract Pkg-I, II and IV of construction of
balance work of the 4-laning of the section from Jorhat to Jhanji of NH-37
(Old) in the state of Assam under SARDP-NE, under EPC mode.
Nagaland
Special repair of NH-202, Mokokchung-Tuensang (from km 00.000 to 95.000)
(total length = 95.000 km) in the state of Nagaland for the FY 2020-21.
Construction of 2-laning with hard shoulder of Peren-Dimapur section NH-129A
from design km 146+208 to km 163.592 (length 17.384 km) in the state of
Nagaland on EPC mode (Pkg-III) under NH(O)-TSP.
Balance work for construction of 2-laning with hard shoulder of
Peren-Dimapur section NH-129A from km 126.775 to design km 146+208 (length
19.433 km) in the state of Nagaland on EPC mode (Pkg-II) under NH(O)-TSP.
Upgradation of road from Mhainnamtsi to Heningkunglwa via Dungki and Lamhai
in Peren District under Central Road and Infrastructure Fund (CRIF) scheme
for the state of Nagaland during the year 2023-24 (total length = 12.505
km).
Construction of road from Jaluki (NH-129A) to New DC Complex Model Township,
Peren, in the state of Nagaland under NESID for the year 2023-24 (total
length = 9.959 km).
Construction of 2-laning with paved / hard shoulder of Peren-Dimapur Road
section on NH-129A from design km 120.500 to design km 123.380 (Construction
Ch. 120.320 to Ch. 123.200) (Design length = 2.88 km) in the state of
Nagaland on EPC mode under NH(O)-TSP (Package-1A).
Sikkim
Construction / Upgradation of existing road to 2-lane with paved shoulder
including geometric improvement from Ranipool to Pakyong from km 2.00 to
16.167 (balance work) of NH-717A on EPC basis under SARDP-NE Phase “A”.
Tripura
Improvement and widening to two lanes with paved shoulder of road from
existing km 438.170 (Khowai Chowmuhani) to existing km 439.410 (South
Pulinpur) of NH-8 and from design km 0.000 (South Pulinpur) to design km
36.000 (Near Rangamati) of NH 208 on Khowai-Teliamura-Harina section (total
length 37.24 km) (Package-II) in the state of Tripura on EPC mode under JICA
ODA Loan Phase-6.